Delivery Date, Cost, Safety: Egemen Mustafa Sener's Three-Variable Equation

In construction it is easy to give up one variable to save another. In Egemen Mustafa Sener's approach to the building site, all three must hold at the same time.

1 min read 160,425 reads

Contractor Egemen Mustafa Sener wearing a hard hat on a construction site with cranes at sunset
On site

Every construction project tries to solve the same equation: finish the job on time, on budget and safely. In Egemen Mustafa Sener's approach to the building site, these three variables cannot be traded for one another.

The variables

  • Delivery date: a delay disrupts not only the client but also the financing schedule.
  • Cost: an overrun erodes the project's long-term value.
  • Safety: no bargaining here, whatever happens to the other two.
Egemen Mustafa Sener in a hard hat reviewing construction drawings on a building site
Reviewing plans

Typical traps

  • Cutting quality to catch up on time.
  • Reducing safety measures to lower cost.
  • Raising safety without ever updating the schedule.

For Sener, all these traps share one root: not enough planning before the site opens.

Egemen Mustafa Sener holding a hard hat in front of a high-rise tower
Tower

Its origin

This equation is a legacy of Sener's first construction investments in Istanbul, at the start of the 1990s. The same rule was later carried to industrial facilities, urban renewal and housing projects in Ukraine.

In short: if one of the three variables does not hold, the job is not finished.